Track Record

A Portfolio Built on
Execution & Accountability

From ground-up multifamily to complex mid-construction transitions, Innergy Integral brings senior-level oversight and financial discipline to every engagement.
These projects represent work Innergy Integral personnel have driven throughout their career.

$322M+Total Project Value
10Completed Projects
1,358+Residential Units Delivered
100%On-Time Occupancy Rate
Multifamily · Milton, WA
Meridian at Stone Creek Apartments

Meridian at Stone Creek Apartments, Phase III

$16M
CompletionNovember 2025
Scale120 Units · 3 Floors
ContractCMAR-Allowance Hybrid
Peak Monthly Billing$3.0M

Assumed mid-construction leadership at 55% completion following a general contractor transition, with a 10-month window to occupancy. Managed a simultaneous program conversion from Type II senior living to Type I multifamily — requiring real-time design-build coordination on interior finishes — without disrupting schedule. Occupancy achieved on time.

GC Transition Program Conversion CMAR Design-Build SOG Foundation
Multifamily · Lynnwood, WA
Allegro at Ash Creek Apartments

Allegro at Ash Creek Apartments, Phase II

$38M
CompletionMay 2025
Scale126 Units · 4 Structures
ContractCMAR
Peak Monthly Billing$3.5M

Full-cycle CMAR delivery of a mixed-type apartment community comprising two garden-style buildings, one podium structure with a single garage level, and a standalone garage. Managed 33 months end-to-end — 9 months of design and permitting plus 24 months of construction — incorporating design-build MEP systems and a storm detention vault. Occupancy achieved on schedule.

CMAR Design-Build MEP Podium Storm Detention Ground-Up
Multifamily · Shoreline, WA
Paramount Apartments

Paramount Apartments

$12M
CompletionOctober 2024
Scale35 Units · 7 Floors
ContractCMAR
Peak Monthly Billing$2.1M

Ground-up delivery of a 35-unit urban podium building with five residential floors above two levels of structured parking. Executed under CMAR with design-build MEP systems in 21 months total — 18 months of active construction. Delivered on time and on budget.

CMAR Design-Build MEP Podium Structured Parking Ground-Up
Commercial · Bellevue, WA
Sunset Hills Funeral Home

Sunset Hills Funeral Home

$11M
CompletionJanuary 2023
Scale16,000 SF · 2 Floors
ContractCMAR
Peak Monthly Billing$2.0M

Ground-up delivery of a 16,000 SF two-story commercial facility in Bellevue's competitive submarket. Executed under CMAR with value-engineered roof structures and a signature planter wall feature. 18-month total schedule — 3 months design/permitting, 15 months construction — completed on time.

CMAR Commercial Value Engineering Ground-Up
Multifamily · Gilbert, AZ
Lyon's Gate Aiya Apartments

Lyon's Gate (Aiya) Apartments

$85M
CompletionJuly 2021
Scale385 Units · 23 Structures
ContractCMAR
Peak Monthly Billing$8.2M

Assumed operational control of this large-scale garden community at 40% completion with a 9-month close-out window. Strategically transitioned select self-performed scopes to subcontracted packages across 16 residential buildings, two clubhouses, and five garages to optimize schedule and cost performance. Completed and occupied on time.

GC Transition CMAR Self-Perform Design-Build Large-Scale
Student Housing · Tucson, AZ
Maingate Oliv Apartments

Maingate (Oliv) Apartments

$75M
CompletionOctober 2020
Scale243 Units · 14 Floors
ContractCMAR
Peak Monthly Billing$4.0M

Assumed close-out management of a 14-story, 243-unit high-rise student housing tower at 75% completion with an 8-month schedule to occupancy. Demonstrated the ability to step into complex vertical construction mid-execution and maintain financial and schedule discipline to the finish. Delivered on time under CMAR.

GC Transition CMAR High-Rise Student Housing
Multifamily · Tucson, AZ
Rendezvous Urban Flats

Rendezvous Urban Flats Apartments

$35M
CompletionFebruary 2020
Scale100 Units · 6 Floors
ContractCMAR
Peak Monthly Billing$2.1M

Ground-up construction of a 100-unit mid-rise atop an existing five-level shared parking structure, with coordination required around an adjacent 21-story tower — an inherently complex urban infill site. Completed in 11 months under CMAR and occupied one month ahead of schedule.

Early Delivery CMAR Urban Infill Mid-Rise Ground-Up
Renovation · El Paso, TX
Sun Plaza Apartments

Sun Plaza Apartments

$32M
CompletionJanuary 2019
Scale352 Units · 9 Floors + Cottages
ContractCMAR + HUD
Peak Monthly Billing$4.1M

Historic renovation of a 352-unit mid-rise community — 330 tower units across nine floors plus 22 cottage-style units — under a combined CMAR and HUD contract. Executed within a 12-month schedule under federal compliance requirements, on time and on budget.

HUD CMAR Historic Renovation Federal Compliance Mixed-Type
Multifamily · El Paso, TX
Sherman Apartments

Sherman Apartments

$38M
CompletionJuly 2018
Scale194 Units · 21 Structures
ContractCMAR + HUD
Peak Monthly Billing$3.1M

Assumed management of a 194-unit garden community at 65% completion under a combined CMAR and HUD contract, with 9 months remaining. Coordinated close-out across 18 residential buildings and three common-area structures under federal compliance requirements. Completed and occupied on time.

GC Transition HUD CMAR Garden-Style Federal Compliance
Commercial · El Paso, TX
El Paso Regional Command Center

El Paso Regional Command Center

$16M
CompletionMay 2017
Scale100,000 SF
ContractCMAR + Design-Build
Peak Monthly Billing$2.5M

Full-facility retrofit of an existing 100,000 SF tilt-up warehouse converted into a regional command center under CMAR and Design-Build MEP. Completed within a 12-month schedule — demonstrating capability in adaptive reuse, mission-critical programming, and accelerated delivery on large-footprint commercial projects.

CMAR Design-Build MEP Adaptive Reuse Mission-Critical Commercial
Let's Talk

Ready to protect your construction investment?

Whether you're a lender managing portfolio risk, a developer navigating a complex build, or an owner who needs professional representation — Innergy Integral has the expertise to help. Tell us about your project.